Tuesday January 19
8:30 AM
Internal Joint Seals Room 22
Laredo's Flores Storm Sewer Improvement Room 21
Severe Wastewater Testing Program for Rapid Evaluation of Manhole Linings Room 20
9:00 AM
A Practical Review of Manhole Safety Practices and Procedures Room 20
Advancing the Envelope: New Trenchless Projects with HDPE Pipe Room 18
Decomissioning of Abandoned Gas Mains Utilizing the Pipe Bursting Method Room 25
HDD On-Line/On-Grade Case Study Room 21
Sliplining Room 22
9:30 AM
Cured-in-Place-Pipe Room 22
Design-Build Sewer Rehabilitation Solution for Military Base Project Room 21
International Standards For Technology And Underground Utilities Room 18
Large Diameter Gravity Sewer Pipe Bursting in the Bay Area Using Two Different S... Room 25
True Green Manhole Liner Room 20
10:00 AM
Emerald Coast Utilities Authority: Central Water Reclamation Facility 'Design &... Room 21
Look Ma, No Hands: Using Automated Controls in Temporary Bypass Pumping Applicat... Room 18
Manhole Inspections for New Installations and Rehabilitation: How to do it and W... Room 20
Pipe Renewal with Folded Pipe Liners Room 22
The Underground Story to Trenchless Technology on an Island Room 25
10:30 AM
Grout-in-Place Lining Room 22
How to Identify & Eliminate Manhole Chimney Area Leakage Room 20
Novel Trenchless Application for Critical Grade Municipal Distribution Installat... Room 21
Performance Limit Testing of Internally Restrained PVC Pipe Room 18
11:00 AM
Lateral Lining Room 22
Overcoming Unique Field Installation Obstacles for Cured-In-Place Manhole (CIPM)... Room 20
Pilot Tube Microtunneling in Baton Rouge Room 21
Static Pipe Bursting Cartridge Loading Techniques for Installation of Segmented/... Room 25
The Trenchless Industry Needs a Standard Definition of 'Structural' Room 18
1:00 PM
Increasing Your Revenue Stream Through Pipeline Laser and Sonar Profiling Room 21
Reduce Your Carbon Footprint Using Trenchless Technology (Presented by the North... Room 18
Sectional Point Repairs: Modern Methods Making Repair of Small Sections of Pipe... Room 22
Trenchless Replacement of Sliplined and CIPP Lined Pipes on Malmstrom Air Force... Room 25
1:30 PM
Asbestos Cement Pipe: What Are the Real Rules? Room 25
Controlling Root Infiltration Room 22
Rehab of 100-Year-Old Brick Storm Sewer Room 21
2:00 PM
2:30 PM
Clay to Clay Static Pipe Bursting Process: A First in California Room 25
Pipe Bursting: Static, Hydraulic, Splitting & Laterals Room 22
Renewal of Water Distribution Pipes Using Elastomeric Polyurea Lining Room 18
Turning the Corner: Examining the Role of Preventative Maintenance in Establishi... Room 21
3:00 PM
Wednesday January 20
8:30 AM
Rehab of Very Large Non-Circular Sewers - Challenges Galore Room 21
Solving Hydrogen Sulfide Corrosion with Proven Solutions Room 20
9:00 AM
21st Century Resin Alternatives for Pipe Rehab Room 21
Black Point WWTP at Miami-Dade Uses Corrosion Protected Concrete Room 20
New Tech For Sewer/Water Construction & Rehab Room 22
Facebook
Twitter
MySpace
LinkedIn
Google
AIM