7:00 AM
Advance Horizontal Directional Drilling School For Pressure, Gravity and Cable, Water, Oil & Gas Pipes, Road, Railroad and River CrossingsTampa Marriott Waterside Hotel
Trenchless Technology Construction Methods For Water, Sewer, Gas, Road & Railroad Crossings, Joint Utility Network and CableTampa Marriott Waterside Hotel
Trenchless Technology Pipe Lining, Renewal & Replacement Methods For Sanitary & Storm Sewers, Water Pipe Distributions, Gas Transmission and Distribution, Culvert and Drainage StructuresTampa Marriott Waterside Hotel
8:30 AM
1:00 PM
8:30 AM
Elmendorf Air Force Base uses CIPP Solution for Structural Rehab of Water MainsRoom 24
Internal Joint SealsRoom 22
Laredo's Flores Storm Sewer ImprovementRoom 21
Providing Better Ticket Information to One Call Helps Get the Paint Down When and Where You Want ItRoom 17
Rigonomics: Advanced HDD PlanningRoom 16
Severe Wastewater Testing Program for Rapid Evaluation of Manhole LiningsRoom 20
9:00 AM
A Practical Review of Manhole Safety Practices and ProceduresRoom 20
Advancing the Envelope: New Trenchless Projects with HDPE PipeRoom 18
Converting Overhead Utilities to UndergroundRoom 15
Cured-in-Place Pipe for Pressure Pipe RehabilitationRoom 24
Decomissioning of Abandoned Gas Mains Utilizing the Pipe Bursting MethodRoom 25
HDD On-Line/On-Grade Case StudyRoom 21
SlipliningRoom 22
The Study of Carbon Fiber Reinforced Polymer (CFRP) as a Long Term Repair SolutionRoom 19
9:30 AM
Cured-in-Place-PipeRoom 22
Design-Build Sewer Rehabilitation Solution for Military Base ProjectRoom 21
International Standards For Technology And Underground UtilitiesRoom 18
Large Diameter Gravity Sewer Pipe Bursting in the Bay Area Using Two Different Static MethodsRoom 25
Largest Pre-Chlorinated Pipe Bursting Project in North AmericaRoom 19
Manual of Practice for Below-Ground Pipeline Networks for Utility CablesRoom 15
Supplementing One Call: How to Get Accurate Locates on Private PropertyRoom 17
True Green Manhole LinerRoom 20
10:00 AM
Emerald Coast Utilities Authority: Central Water Reclamation Facility 'Design & Conservation Challenges for Transmission Mains'Room 21
Look Ma, No Hands: Using Automated Controls in Temporary Bypass Pumping ApplicationsRoom 18
Manhole Inspections for New Installations and Rehabilitation: How to do it and What to Look ForRoom 20
Pipe Renewal with Folded Pipe LinersRoom 22
Pushing the Limits of Hard Rock Auger Boring: How to Make a Project a Record-BreakerRoom 15
Replacement of Gas Mains Utilizing the Pipe Bursting Method in North AmericaRoom 24
Tampa Bay Water Tackles Growth with Diverse Underground InstallationsRoom 19
The Underground Story to Trenchless Technology on an IslandRoom 25
10:30 AM
Cable Systems in Multi-Purpose or Shared StructuresRoom 15
Design of Distribution Pipeline for Reclaimed Water SystemRoom 19
Grout-in-Place LiningRoom 22
How to Identify & Eliminate Manhole Chimney Area LeakageRoom 20
Large Diameter Static Pipe Bursting Solution for Replacement of Lined Ductile Iron Force MainRoom 24
Novel Trenchless Application for Critical Grade Municipal Distribution InstallationsRoom 21
Performance Limit Testing of Internally Restrained PVC PipeRoom 18
Preventing Deadly Accidents in Confined Work SpacesRoom 17
11:00 AM
-Distance Thermal Grouting of Underground Conduit-In-Casting Case Histories, Technology & ApplicationRoom 15
Lateral LiningRoom 22
Live Inspection of Large Diameter PCCP Using a Free-Swimming ToolRoom 24
Overcoming Unique Field Installation Obstacles for Cured-In-Place Manhole (CIPM) LiningRoom 20
Pilot Tube Microtunneling in Baton RougeRoom 21
Static Pipe Bursting Cartridge Loading Techniques for Installation of Segmented/Sectional Product PipeRoom 25
The Trenchless Industry Needs a Standard Definition of 'Structural'Room 18
1:00 PM
Cross Bores and Legacy GuidelinesRoom 17
Crossbore Replacement
From Landfill Waste To EnergyRoom 15
In-Service Assessment of Metallic MainsRoom 19
Increasing Your Revenue Stream Through Pipeline Laser and Sonar ProfilingRoom 21
Reduce Your Carbon Footprint Using Trenchless Technology (Presented by the North American Society For Trenchless Technology)Room 18
Sectional Point Repairs: Modern Methods Making Repair of Small Sections of Pipe Both Effective & EconomicalRoom 22
The Ice Road Highway: New Technique of Installing Large Diameter Casing Over Existing Collapsed InfrastructureRoom 16
Trenchless Replacement of Sliplined and CIPP Lined Pipes on Malmstrom Air Force BaseRoom 25
1:30 PM
Asbestos Cement Pipe: What Are the Real Rules?Room 25
Controlling Root InfiltrationRoom 22
Emergency River Crossing Completed Using HDD & Design BuildRoom 16
Greensboro's Pilot Program for Water Pipebursting Leads To Expanded City Wide ProgramRoom 19
Hurricanes' Utilities Impact and Rapid RecoveryRoom 15
Pipeline Assessment & Certification Program (Pacp) Implementation Strategies And TechniquesRoom 24
Rehab of 100-Year-Old Brick Storm SewerRoom 21
2:00 PM
2:20 PM
2:30 PM
Clay to Clay Static Pipe Bursting Process: A First in CaliforniaRoom 25
Excavation Risk Management & Cost AvoidanceRoom 15
Get the DIRT on Underground Utility Incidences
Managing & Maintaining a Concrete Cylinder Pipe (CCP) Water MainRoom 19
Pipe Bursting: Static, Hydraulic, Splitting & LateralsRoom 22
Renewal of Water Distribution Pipes Using Elastomeric Polyurea LiningRoom 18
Turning the Corner: Examining the Role of Preventative Maintenance in Establishing an O&M Asset Management ProgramRoom 21
3:00 PM
8:00 AM
8:30 AM
Improving the Economics of HDD Pilot-Drilling Using Gyroscopic Steering ToolsRoom 18
Rehab of Very Large Non-Circular Sewers - Challenges GaloreRoom 21
Solving Hydrogen Sulfide Corrosion with Proven SolutionsRoom 20
Structural Rehabilitation of Storm and Sewer Pipe by the Centrifugally Cast Concrete Pipe ProcessRoom 19
Staking University's Locator Certification SeminarRoom 17
9:00 AM
8:00 AM
CIPP Inspector Training & Certification Program, Day 1Tampa Marriott Waterside Hotel
NASTT: Horizontal Directional Drilling GuidelinesTampa Convention Center
NASTT: New Installation Methods: Application of Grade, Alignment Control, GuidanceTampa Convention Center
NASTT: Pipe BurstingTampa Convention Center
Pipeline Assessment and Certification Program (PACP), Day 1Tampa Convention Center
8:30 AM
9:00 AM
9:30 AM
8:00 AM
1:00 PM
footer::loading
